News

You are here: Home » News » Points Of Piping Installation in Winter

Points Of Piping Installation in Winter

Views: 0     Author: Site Editor     Publish Time: 2021-10-26      Origin: Site

1. Pipes and fittings should be stored in a warm place in winter.

2. Tightly cover the adhesive and store it in a place with temperature 5-33℃, making sure the glue can flow freely before use.When the adhesive get viscous due to cold weather, it should be moved to the place with room temperature and leave it in a period of time, and then use it after it returns to its normal consistency.Shake the adhesive for more than 30 seconds until it is uniform.

3. At low temperatures, the hardness of the pipe surface will increase, and the softening and penetration of the adhesive is slower than at room temperature, so it is necessary to use more pre-adhesive to soften the pipe surface first, and it takes more time to cure and dry after connection. Workers should pay more attention to the details in cold winter.

4. If the temperature is too low, you can move the pre-adhesive and adhesive to the room to slowly increase the temperature, and do not use flame and other methods to heat the adhesives to quickly increase temperature.



Contact us

*Please upload only jpg, png, pdf files. Size limit is 25MB.

Apply Our Best Quotation
'CENIT' is a brand of Huasheng Pipeline Technology CO., Ltd.

About Us

Products

© COPYRIGHT 2024 HUASHENG PIPELINE TECHNOLOGY CO,.LTD ALL RIGHTS RESERVED.