Products

You are here: Home » Product » PE Fitting » ISO4427 PE Butt Fusion Fitting » Butt Fusion PE Female Tee

Butt Fusion PE Female Tee

Pressure data:PN6(SDR26)/PN8(SDR21)/PN10(SDR17)/PN12.5(SDR13.6)/PN16(SDR11)
Standards:DIN, BS, ANSI, CNS; NPT, BSPT, JIS
Dimension:T110*2"~200*2"
Name of Certification:ISO9001,SGS,CE, NSF, ISO14001
Availability:
Quantity:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button


Description of Butt Fusion PE Female Tee


Name of product butt fusion PE female tee
Materials Polyethylene(PE)/High Density Polyethylene(HDPE)
Temperature Range -40°C ~ +80°C.
Valve Color Black
connect/joining Socket fusion/butt fusion/butt fusion welded
Delivery 3~20 days after receiving the deposit, depends on the quantity
Usage area for water supply,gas, municipal water supply, portable water, drinking water, etc

       


size dn RC L H
T110-2"F 110 2" 280 100
T160-2"F 160 2" 280 130
T200-2"F 200 2" 340 150

Plastic pipeline construction and installation method-threaded connection


Threaded connection of plastic pipe fittings


The thread of pipe fittings should be clean and not messy. When installing, do not rotate with excessive force. Under normal circumstances, the thread is fastened, leaving 2-3 threads, and it can be sealed. When installing large-size pipe fittings, it is recommended to use belt wrenches, pipe wrenches, vise and other similar tools that will damage the plastic pipes and pipe fittings, so it is not recommended to use them. Experience has shown that when the torque is 10-25ft.-lbs, the best seal is achieved. After installation, avoid the influence of large external forces, such as sharp objects hitting, falling or violently pulling.


huasheng factory 1

huasheng factory 2

huasheng factory 3

huasheng factory 5

huasheng factory 4


show room

Show Room


Huasheng Advantage


Management: 

Administrators have overseas education background or working experiences, they introduce up-to-date management skills and cutting-edge technologies to the team


Machinery:

Over 200 injection machines, 80 mechanical processing equipment, including machinery imported from Taiwan, Japan and Germany


Experience:

Huasheng established in 1988 who had over 20 years of experience in plastic extrusion and injection


Quality Assurance: 

 24-hour Rigorous QC Team that follows ISO 9001 quality management system


Laboratory: 

A rounded system of up-to-date software and testing equipment for R&D


huasheng factory

Previous: 
Next: 
Apply Our Best Quotation
'CENIT' is a brand of Huasheng Pipeline Technology CO., Ltd.

About Us

Products

© COPYRIGHT 2024 HUASHENG PIPELINE TECHNOLOGY CO,.LTD ALL RIGHTS RESERVED.