Products
Availability: | |
---|---|
Quantity: | |
Name of product | butt fusion PE female tee |
Materials | Polyethylene(PE)/High Density Polyethylene(HDPE) |
Temperature Range | -40°C ~ +80°C. |
Valve Color | Black |
connect/joining | Socket fusion/butt fusion/butt fusion welded |
Delivery | 3~20 days after receiving the deposit, depends on the quantity |
Usage area | for water supply,gas, municipal water supply, portable water, drinking water, etc |
size | dn | RC | L | H |
T110-2"F | 110 | 2" | 280 | 100 |
T160-2"F | 160 | 2" | 280 | 130 |
T200-2"F | 200 | 2" | 340 | 150 |
Plastic pipeline construction and installation method-threaded connection
Threaded connection of plastic pipe fittings
The thread of pipe fittings should be clean and not messy. When installing, do not rotate with excessive force. Under normal circumstances, the thread is fastened, leaving 2-3 threads, and it can be sealed. When installing large-size pipe fittings, it is recommended to use belt wrenches, pipe wrenches, vise and other similar tools that will damage the plastic pipes and pipe fittings, so it is not recommended to use them. Experience has shown that when the torque is 10-25ft.-lbs, the best seal is achieved. After installation, avoid the influence of large external forces, such as sharp objects hitting, falling or violently pulling.
show room
Administrators have overseas education background or working experiences, they introduce up-to-date management skills and cutting-edge technologies to the team
Over 200 injection machines, 80 mechanical processing equipment, including machinery imported from Taiwan, Japan and Germany
Huasheng established in 1988 who had over 20 years of experience in plastic extrusion and injection
24-hour Rigorous QC Team that follows ISO 9001 quality management system
A rounded system of up-to-date software and testing equipment for R&D
Name of product | butt fusion PE female tee |
Materials | Polyethylene(PE)/High Density Polyethylene(HDPE) |
Temperature Range | -40°C ~ +80°C. |
Valve Color | Black |
connect/joining | Socket fusion/butt fusion/butt fusion welded |
Delivery | 3~20 days after receiving the deposit, depends on the quantity |
Usage area | for water supply,gas, municipal water supply, portable water, drinking water, etc |
size | dn | RC | L | H |
T110-2"F | 110 | 2" | 280 | 100 |
T160-2"F | 160 | 2" | 280 | 130 |
T200-2"F | 200 | 2" | 340 | 150 |
Plastic pipeline construction and installation method-threaded connection
Threaded connection of plastic pipe fittings
The thread of pipe fittings should be clean and not messy. When installing, do not rotate with excessive force. Under normal circumstances, the thread is fastened, leaving 2-3 threads, and it can be sealed. When installing large-size pipe fittings, it is recommended to use belt wrenches, pipe wrenches, vise and other similar tools that will damage the plastic pipes and pipe fittings, so it is not recommended to use them. Experience has shown that when the torque is 10-25ft.-lbs, the best seal is achieved. After installation, avoid the influence of large external forces, such as sharp objects hitting, falling or violently pulling.
show room
Administrators have overseas education background or working experiences, they introduce up-to-date management skills and cutting-edge technologies to the team
Over 200 injection machines, 80 mechanical processing equipment, including machinery imported from Taiwan, Japan and Germany
Huasheng established in 1988 who had over 20 years of experience in plastic extrusion and injection
24-hour Rigorous QC Team that follows ISO 9001 quality management system
A rounded system of up-to-date software and testing equipment for R&D
Products