1. When the pipes are transported in batches, the sockets and sockets should be arranged in layers and staggered, and the whole should be tied with a cable and fixed firmly. Cable
The fixed place and pipe end should be protected by soft materials.
2. When loading, unloading, transporting, and stacking the pipes, they should be lifted and placed gently. In any case, it is strictly forbidden to roll on the ground by itself.
When handling and moving by pulling and pulling, it is strictly forbidden to drop, roll, and collide with each other, and pay special attention to the protection of the pipe ends. Dangcai
When hoisting the filling tube with mechanical equipment, non-metallic rope (belt) must be used for hoisting.
3. When the pipe is transported, it should be placed on a flat-bottomed car with baffles or in a flat cabin. The stacking place shall not be likely to damage the pipe
The sharp protrusions of the material should be tied and fixed with non-metallic ropes (belts) and sun protection measures should be taken.
4. When pipe fittings and valves are transported, they should be stacked neatly one by one according to the box, fixed firmly, and rain-proof measures should be taken.
5. Before loading, make sure that the packaging is free from damage, deformation, moisture, etc. Otherwise, it is not allowed to load the vehicle and require replacement of the packaging.
6. Mixed consignment with oil or chemicals is strictly prohibited.