Views: 0 Author: Site Editor Publish Time: 2021-08-14 Origin: Site
There are some points for attention for piping system installation in different seasons.
In summer,we need to follow the instructions as below:
Before installation, pipes and fittings, adhesives and pre-adhesive cement should be stored indoors or in a cool place.
Wipe with a damp cloth on the socket parts for pipes and fittings, but wait until it is completely dry before applying the adhesive
Try to install and operate in the morning or evening when the temperature is lower.
Try to connect pipe adn fittings when the solvent cement is still wet. For big diameter pipes or fittings, more than 2 people must cooperate to finish the socketing.

Schedule 40 Vs Schedule 80 PVC Pipe: Differences, Pressure Ratings And How To Choose
Top 12 Plastic PVC Fittings Manufacturers in Ecuador (2026 Updated Guide)
Top 12 PVC Fittings Manufacturers in Vietnam (2026 Updated Guide)
PVDF (Polyvinylidene Fluoride): Properties, Applications, And Manufacturing
Top 10 PVC Fittings Manufacturers and Suppliers in Malaysia (2026 Guide)
Check Valve vs Foot Valve: Key Differences, Applications & How to Choose
Top 11 Plastic PVC Fittings Manufacturers in Indonesia (2026 Updated Guide)
Products