Products
Availability: | |
---|---|
Quantity: | |
Name of product | butt fusion welded PE tee |
Delivery | 3~20 days after receiving the deposit, depends on the quantity |
Dimension | T900~1200 |
Name of Certification | ISO9001,SGS,CE, NSF, ISO14001 |
Temperature Range | -40°C ~ +80°C. |
Pressure data | PN6(SDR26)/PN8(SDR21)/PN10(SDR17)/PN12.5(SDR13.6)/PN16(SDR11) |
size | dn | L |
D710 | 710 | 710 |
D800 | 800 | 800 |
D900 | 900 | 900 |
D1000 | 1000 | 1000 |
D1200 | 1200 | 1200 |
If the pipes and fittings are stored outdoors, they should be covered. The ground on which the pipe is placed should be flat, preferably with support pads to avoid bending and sagging of the pipe. When stacking pipes, make sure that the upper pipes will not cause squeezing, cracking or deformation damage to the ground pipes. The stacking height should not exceed 1.5m, and it should not be shaken or loose. Sockets and sockets should be stacked alternately in parallel and not vertically stacked. The socket part should be suspended from the end of the socket.
show room
Administrators have overseas education background or working experiences, they introduce up-to-date management skills and cutting-edge technologies to the team
Over 200 injection machines, 80 mechanical processing equipment, including machinery imported from Taiwan, Japan and Germany
Huasheng established in 1988 who had over 20 years of experience in plastic extrusion and injection
24-hour Rigorous QC Team that follows ISO 9001 quality management system
A rounded system of up-to-date software and testing equipment for R&D
Name of product | butt fusion welded PE tee |
Delivery | 3~20 days after receiving the deposit, depends on the quantity |
Dimension | T900~1200 |
Name of Certification | ISO9001,SGS,CE, NSF, ISO14001 |
Temperature Range | -40°C ~ +80°C. |
Pressure data | PN6(SDR26)/PN8(SDR21)/PN10(SDR17)/PN12.5(SDR13.6)/PN16(SDR11) |
size | dn | L |
D710 | 710 | 710 |
D800 | 800 | 800 |
D900 | 900 | 900 |
D1000 | 1000 | 1000 |
D1200 | 1200 | 1200 |
If the pipes and fittings are stored outdoors, they should be covered. The ground on which the pipe is placed should be flat, preferably with support pads to avoid bending and sagging of the pipe. When stacking pipes, make sure that the upper pipes will not cause squeezing, cracking or deformation damage to the ground pipes. The stacking height should not exceed 1.5m, and it should not be shaken or loose. Sockets and sockets should be stacked alternately in parallel and not vertically stacked. The socket part should be suspended from the end of the socket.
show room
Administrators have overseas education background or working experiences, they introduce up-to-date management skills and cutting-edge technologies to the team
Over 200 injection machines, 80 mechanical processing equipment, including machinery imported from Taiwan, Japan and Germany
Huasheng established in 1988 who had over 20 years of experience in plastic extrusion and injection
24-hour Rigorous QC Team that follows ISO 9001 quality management system
A rounded system of up-to-date software and testing equipment for R&D
Products