Availability: | |
---|---|
Quantity: | |
Class: S5/SDR11 (PN10)
d | weight [kg] | L [mm] | L1 [mm] | e [mm] |
20 | 0.007 | 32 | 24 | 2.2 |
25 | 0.011 | 34 | 25 | 2.5 |
32 | 0.019 | 36 | 25 | 3.2 |
40 | 0.033 | 39 | 25 | 4 |
50 | 0.095 | 42 | 29 | 4.9 |
63 | 0.145 | 47 | 29 | 6.1 |
75 | 0.241 | 49 | 29 | 7.2 |
90 | 0.429 | 57 | 34 | 8.6 |
110 | 0.57 | 70 | 43 | 10.4 |
125 | 0.57 | 79 | 48 | 11.4 |
140 | 0.854 | 88 | 55 | 12.7 |
160 | 1.256 | 100 | 60 | 14.6 |
200 | 2.448 | 124 | 75 | 18.2 |
225 | 3.495 | 140 | 85 | 20.5 |
250 | 7.89 | 225 | 133 | 22.7 |
280 | 10.17 | 235 | 143 | 25.4 |
315 | 11.69 | 255 | 154 | 28.6 |
In the process of transportation and unloading, you should understand the handling method of plastic pipes, and minimize the possibility of damage during handling. Before leaving the factory, the Huasheng tube is handled carefully according to the characteristics of the thermoplastic tube, whether it is stored or transported. Logistics personnel should ensure that the pipeline is not damaged during transportation; after receiving the goods, the consignee should confirm the integrity of the pipe in time, and carefully unload and store it according to the characteristics of the pipe.
show room
Administrators have overseas education background or working experiences, they introduce up-to-date management skills and cutting-edge technologies to the team
Over 200 injection machines, 80 mechanical processing equipment, including machinery imported from Taiwan, Japan and Germany
Huasheng established in 1988 who had over 20 years of experience in plastic extrusion and injection
24-hour Rigorous QC Team that follows ISO 9001 quality management system
A rounded system of up-to-date software and testing equipment for R&D
Class: S5/SDR11 (PN10)
d | weight [kg] | L [mm] | L1 [mm] | e [mm] |
20 | 0.007 | 32 | 24 | 2.2 |
25 | 0.011 | 34 | 25 | 2.5 |
32 | 0.019 | 36 | 25 | 3.2 |
40 | 0.033 | 39 | 25 | 4 |
50 | 0.095 | 42 | 29 | 4.9 |
63 | 0.145 | 47 | 29 | 6.1 |
75 | 0.241 | 49 | 29 | 7.2 |
90 | 0.429 | 57 | 34 | 8.6 |
110 | 0.57 | 70 | 43 | 10.4 |
125 | 0.57 | 79 | 48 | 11.4 |
140 | 0.854 | 88 | 55 | 12.7 |
160 | 1.256 | 100 | 60 | 14.6 |
200 | 2.448 | 124 | 75 | 18.2 |
225 | 3.495 | 140 | 85 | 20.5 |
250 | 7.89 | 225 | 133 | 22.7 |
280 | 10.17 | 235 | 143 | 25.4 |
315 | 11.69 | 255 | 154 | 28.6 |
In the process of transportation and unloading, you should understand the handling method of plastic pipes, and minimize the possibility of damage during handling. Before leaving the factory, the Huasheng tube is handled carefully according to the characteristics of the thermoplastic tube, whether it is stored or transported. Logistics personnel should ensure that the pipeline is not damaged during transportation; after receiving the goods, the consignee should confirm the integrity of the pipe in time, and carefully unload and store it according to the characteristics of the pipe.
show room
Administrators have overseas education background or working experiences, they introduce up-to-date management skills and cutting-edge technologies to the team
Over 200 injection machines, 80 mechanical processing equipment, including machinery imported from Taiwan, Japan and Germany
Huasheng established in 1988 who had over 20 years of experience in plastic extrusion and injection
24-hour Rigorous QC Team that follows ISO 9001 quality management system
A rounded system of up-to-date software and testing equipment for R&D
Products