2021-07-07
(1) Measure the ground temperature of the construction site first, if it is lower than 10℃, no construction should be done;(2) 12 hours before and after construction, take necessary measures to keep the indoor temperature above 10℃;(3) If the construction is on the cement floor, check whether the fl