News

You are here: Home » News

News and Events

  • 2021-10-08

    Last year, the Chinese government has officially announced that China aims to reach peak emissions before 2030 and achieve carbon neutrality before 2060. That means the transition period from carbon peak to carbon neutrality in China is only 30 years. For the common destiny of all mankind, the Chine
  • 2021-09-18

    We will have a holiday for Mid-Autumn Festival from Sep 19th to Sep21st.Mid-Autumn Festival is also known as Moon Festival,which is an important traditional festival in China.Young people will get back home and have reunion with family on that day.
  • 2021-09-10

    As the PVC raw material price keep increasing again and continue rising recently, Huasheng inform all clients and distributers, our products price will increase 5% based on the orginal price list.Thanks for your support and understanding from all customer.
  • 2021-08-27

    When bonding PVC pipe fittings above DN100, it is recommended that two people work together to install it. When the bonding surface is wet, one person fixes the PVC pipe fitting and the other assists in pushing the PVC pipe into the PVC pipe fitting. The PVC pipe and fittings should be on the same s
  • 2021-08-14

    There are some points for attention for piping system installation in different seasons.In summer,we need to follow the instructions as below:Before installation, pipes and fittings, adhesives and pre-adhesive cement should be stored indoors or in a cool place.Wipe with a damp cloth on the socket pa
  • 2021-08-06

    To improve our product knowledge and to give customers best service, we have training lessons regularly.
  • 2021-07-23

    On July 20th,Zhenzhou city Henan Proince suffered the heaviest rainfall in recent years in China and serious flood came behind. At 18:00 pm July 20th, flood water crashed though No. 5 Zhenzhou metro ,and it was forced to stop at Shakou Road station.More than 500 passengers were trapped in the carria
  • 2021-07-21

    As the temperature is higher in summer, so we need put PVC pipes inside.If the enviroment don't allow the indoor storage, must open the pipe plastic bag and use cloth to cover the pipe to avoid pipe damage.
  • 2021-07-07

    (1) Measure the ground temperature of the construction site first, if it is lower than 10℃, no construction should be done;(2) 12 hours before and after construction, take necessary measures to keep the indoor temperature above 10℃;(3) If the construction is on the cement floor, check whether the fl
  • Total 11 pages  Go to Page
  • Go
Apply Our Best Quotation
'CENIT' is a brand of Huasheng Pipeline Technology CO., Ltd.

About Us

Products

© COPYRIGHT 2024 HUASHENG PIPELINE TECHNOLOGY CO,.LTD ALL RIGHTS RESERVED.